Styku 3D Body Composition Scan

What is Styku Body Scanning?

Styku is an advanced 3D body scanning technology designed to revolutionize how we understand and track health, fitness and wellness. By combining cutting-edge infrared imaging with precise body composition analysis, Styku provides a detailed, accurate picture of your body’s unique metrics. Whether you’re looking to monitor progress, set personalized goals, or make informed health decisions, Styku offers the tools and insights to help you achieve lasting results.

Styku Body Composition Analysis Pricing

$49 | members -$25

Questions About Styku

Styku Provides Transformational Insights

  • Line art icon of one person handing over an object to another person.

    See Real Progress

    Track your changes over time with a 3D model that shows the impact of your hard work.

  • Outline of a pie chart divided into five sections, with one section separated from the rest.

    Understand Your Body

    Get insights into fat mass, lean mass, bone mass, fat distribution, and the benefits and risks associated.

  • Minimalist line drawing of a human waist wearing underwear, with a measuring tape wrapped around the waist.

    Precise Measurements

    Get precise body measurements for your waist, chest, arms, and more to track and celebrate your progress.

  • An outline of a person with arms raised, holding a star with rays emanating from it.

    Set Personalized Goals

    Achieve your goals, whether it's weight loss, muscle gain, or overall health, based on your unique body composition.

  • Minimalist icon of a person running with speed lines to the left.

    Stay Motivated

    Get all your data and visual proof of progress in 3D in just 35 seconds. Keep yourself inspired and focused.

Your Evaluation Results

Person using a tablet to view a 3D body model with health analysis and charts.
Dual 3D scan images of a woman's upper body with arms slightly extended, captured from the front and side views.
Progress report showing before and after 3D body scans with side profile outline on the right.

Once your scan is complete, you'll receive an email with a link to your results, which you can save or download for future reference. At Restoration Health, our team will review your results with you and, if desired, help you develop a personalized plan to improve your health based on the findings.

Preparing for your Styku scan Appointment

To ensure the most accurate results, wear form-fitting clothing.

  • Women: Leggings and a sports bra or a snug tank top.

  • Men: Bike shorts or boxer briefs are ideal.

  • No Preparation Required:

    • No need to fast, change your diet, hydration, or exercise routine prior to your scan.

  • Safety: Scans can be safely completed even with metal jewelry, implants, pacemakers, joint replacements, or during pregnancy.

With these simple steps, you’ll be ready for a smooth and insightful body composition scan!